Particular service

 

Air conditioning and Ventilation of the Tunnel

 

Length of Tunnel     2 km      Project    Da-Huang section of the lot 2 of Guangzhou Metro Line 6

Service   Design and installation of two air conditioning equipments, the temperature in the tunnel was

               cooled to lower than 30. (2007)

Length of Tunnel     2 km      Project    Min-Wu section of the lot 5304 of Shenzhen Metro Line 5

Service   Design and installation of two air conditioning equipments, the temperature in the tunnel was

               cooled to lower than 30. (2008)

Length of Tunnel     3 km      Project    Lot 11 of the north extension of Guangzhou Metro line 3

Service   Design and installation of two air conditioning equipments, the temperature in the tunnel was

               cooled to lower than 30. (2008)

 

Design and manufacture of the steel structures

Shield     11.18m Slurry Shield      Project    Lot SDII of Shiziyang Tunnel

Service    Design, manufacture and installation of the Shield launch bracket, the counterforce frame, and

                the hoisting equipment for disassembly inside the tunnel. Design, machining and installation of

                the steel structures for the shield construction.(2007-2011)

Shield     6.28m EPB Shield          Project    Ying-Wu section of the lot 7 of Changsha Metro Line 2

Service    Design, machining and installation of the steel structures for the shield construction.(2011)

Shield     6.28m EPB Shield          Project    Pi-Zhong section of the lot 10 of Changsha Metro Line 1

Service    Design, machining and installation of the steel structures for the shield construction.(2012)

 

Engineering Survey and Monitoring

Project     city tunnel construction of Beijing area

Service     Undertook the monitoring measurement and the third party surveying commission of the 12km

                 city tunnel construction of Beijing area. Presently, the project is under construction.(2006)

Project     Water drawing tunnel project of nuclear power station

Service     Undertook the third party monitoring commission of one Water drawing tunnel project of a

                 domestic nuclear power station. Presently, the project is under construction.(2008)

Project     Tian-Shi section of the lot 01 of Beijing Metro Line 6

Service      Undertook the measurement of the shield launch, excavation and out.( (2011) 

Project     Lot 3 of Shenyang-Tieling Inter-city Transit Line

Service      Undertook the measurement of the shield launch, excavation and out.( (2012)

 

 