Air conditioning and Ventilation of the Tunnel
|
|
Length of Tunnel
2 km
Project
Da-Huang section of the lot 2 of Guangzhou Metro Line 6
|
Service
Design and installation of two air conditioning equipments,
the temperature in the tunnel was
cooled to lower than 30℃.
(2007)
|
Length of Tunnel
2 km
Project
Min-Wu section of the lot 5304 of Shenzhen Metro Line 5
|
Service
Design and installation of two air conditioning equipments,
the temperature in the tunnel was
cooled to lower than 30℃.
(2008)
|
Length of Tunnel
3 km
Project
Lot 11 of
the north extension of Guangzhou Metro line 3
|
Service
Design and installation of two air conditioning equipments,
the temperature in the tunnel was
cooled to lower than 30℃. (2008)
|
|
Design and manufacture of the steel structures
|
Shield
11.18m Slurry Shield
Project
Lot SDII of Shiziyang Tunnel
|
Service
Design,
manufacture
and
installation
of the Shield launch bracket, the counterforce frame, and
the
hoisting equipment
for disassembly inside the tunnel.
Design, machining and
installation of
the steel structures for
the shield construction.(2007-2011)
|
Shield
6.28m EPB Shield
Project
Ying-Wu section of the lot 7 of Changsha Metro Line 2
|
Service
Design, machining and installation of the steel structures for the shield
construction.(2011)
|
Shield
6.28m EPB Shield
Project
Pi-Zhong section of the lot 10 of Changsha Metro Line 1
|
Service
Design, machining and installation of the steel structures for the shield
construction.(2012)
|
|
Engineering Survey and Monitoring
|
Project
city tunnel construction
of
Beijing
area
|
Service
Undertook the monitoring measurement and the third party
surveying commission of the 12km
city tunnel construction
of
Beijing
area.
Presently, the project is under construction.(2006)
|
Project
Water drawing tunnel project of nuclear power station
|
Service
Undertook the
third party monitoring commission of one Water drawing
tunnel project of a
domestic nuclear power station. Presently, the project is
under construction.(2008)
|
Project
Tian-Shi section of the lot 01 of Beijing Metro Line 6
|
Service
Undertook the measurement of the shield launch, excavation and out.(
(2011)
|
Project
Lot 3 of Shenyang-Tieling Inter-city Transit Line
|
Service
Undertook the measurement of the shield launch, excavation and out.(
(2012)
|