There are more than 100 Shield have been assembled until
now
|
Shield
|
12m Slurry Shield
|
Project
|
Santo Domingo
highway tunnel,
Dominica
|
Service
|
Assembly, debugging and disassembly of one TERRATEC Slurry Balance Shield
in the factory
(2009)
|
Shield
|
11.18m Slurry Shield
|
Project
|
Lot SDII of Shiziyang
Tunnel
|
Service
|
Assembly and assistance of debugging, manufacture supervising of two
shield in the factory.
Assembly and debugging on the job site. Butt joint and disassembly inside
the tunnel.
(2007-2011)
|
Shield
|
8.8m EPB Shield
|
Project
|
Lot GZH-3 of Guan-Hui Inter-city transit
|
Service
|
Assembly and debugging of two Robbins EPB shield .(2011)
|
Shield
|
6.45m EPB Shield
|
Project
|
Delhi
Metro,
India
|
Service
|
Assembly, debugging and
disassembly of two
Robbins EPB shield in the factory(2007)
|
Shield
|
5.4m EPB Shield
|
Project
|
Sacramento water diversion tunnel, USA
|
Service
|
Assembly, debugging and
disassembly of two
Robbins EPB shield in the factory(2008)
|
Shield
|
6.26m EPB Shield
|
Project
|
Lot 12 of the sectiopn from Guangzhou to Foshan
|
Service
|
Assembly, debugging and
disassembly of two Robbins EPB shield in the factory.
After-sale
service on the site(2008)
|
Shield
|
6.26m EPB Shield
|
Project
|
Azerbaijan water diversion tunnel
|
Service
|
Assembly, debugging and
disassembly of one
Robbins EPB shield in the factory(2009)
|
Shield
|
6.28m EPB Shield
|
Project
|
Cao-Xi
section of Guangzhou Metro Line 5
|
Service
|
Assembly & debugging of
two Wirth EPB shield
(2006)
|
Shield
|
6.28m EPB Shield
|
Project
|
Lot 11 of the north extension of Guangzhou Metro line 3
|
Service
|
Assembly, debugging and
disassembly of two Herrenknecht EPB shield .(2008)
|
Shield
|
6.28m EPB Shield
|
Project
|
Lot 10 of the sectiopn from Guangzhou to Foshan
|
Service
|
Assembly, debugging and disassembly of two Herrenknecht EPB
shield .(2009)
|
Shield
|
6.28m EPB Shield
|
Project
|
Lot 9 of Changsha Metro Line 2
|
Service
|
Assembly and debugging of one CRCC EPB shield
(2011)
|
Shield
|
6.28m EPB Shield
|
Project
|
Lot 12 of Nanjing Metro Line 3
|
Service
|
Assembly, debugging and disassembly of two Herrenknecht EPB
shield .(2011)
|