The milage of the tunnel that has been excavated until now
is more than 60 km
|
Shield
|
11.18m Slurry Shield
|
Project
|
Lot SDII of Shiziyang
Tunnel
|
Service
|
Design,
manufacture
and
installation
of the Shield launch bracket, the counterforce frame, and
the
hoisting equipment
for disassembly inside the tunnel. Shield
tunneling and equipment
maintenance
of the double lines.Design, machining and installation of
the metal structures for
the shield construction.(2007-2011)
|
Shield
|
6.28m EPB Shield
|
Project
|
Da-Li
project of Guangzhou Metro Line 3
|
Service
|
Undertook
the
most difficult tunneling commission of the left line of Da-Li
project, with the
construction organization & management and the maintenance
of the shield equipment; the
construction equipment was Herrenknecht EPB shield.(2004-2005)
|
Shield
|
6.25m EPB Shield
|
Project
|
lot R406 of Shanghai Metro Line 9
|
Service
|
Assembly
and
disassembly of two Mitsubishi EPB shield . Shield tunneling
and equipment
maintenance.
The average daily advance rate amounted to 14 rings since
the tunneling was
stared officially.
(2006)
|
Shield
|
6.28m EPB Shield
|
Project
|
Lot 5304 of Shenzhen Metro Line 5
|
Service
|
Assembly and
debugging
of two Herrenknecht EPB shield. Shield tunneling and
equipment
maintenance.(2009)
|
Shield
|
6.26m EPB Shield
|
Project
|
Shi-Da section of the lot 01 of Beijing Metro Line 6
|
Service
|
Assembly,
debugging
and disassembly of two Hitachi EPB shield twice. Shield
tunneling and
equipment
maintenance.
This project includes two sections, one single line is 4.4
km long.
(2009-2011)
|
Shield
|
6.25m EPB Shield
|
Project
|
Qi-Shen
section of the lot 5 of Shenyang Metro Line 2
|
Service
|
Assembly,
debugging
and disassembly of one Komatsu EPB shield. Shield tunneling
and
equipment maintenance.
(2009-2010)
|
Shield
|
6.28m EPB Shield
|
Project
|
Tian-Shi section of the lot 01 of Beijing Metro Line 6
|
Service
|
Provide the
equipments
and materials for the tunnel construction such as shield
etc., prepare
the shield tunneling
construction
scheme, carry out all the construction procedures such as
the
shield excavation, the equipment maintenance and the survey.
The project has been completed
successfully.(2011)
|
Shield
|
6.28m EPB Shield
|
Project
|
Ying-Wu section of the lot 7 of Changsha Metro Line 2
|
Service
|
Assembly, debugging and
disassembly
of two CRCC EPB shield . Shield tunneling and
equipment maintenance of the double lines.(2009)
|
|